Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)

Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)

10FT / Transparent Green
$18.29
Skip to product information
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)

Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)

$18.29
Size
Color

View store information

Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs (30FT, Orange)

10FT / Transparent Green

Product Overview

  • Size: 30FT
  • Color: Orange
  • Brand: NIMBLE
  • Material: Polyvinyl Chloride
  • Product Dimensions: 60"L x 0.4"W

Product Features

  • Dog Training Leash : Elevate your dog's recall skills with our dog waterproof leash. Ideal for outdoor activities like hiking, camping, and beach play, it fosters better obedience and a closer bond.
  • Weatherproof Durability : Crafted from PVC coated nylon webbing, our dog waterproof leash remains lightweight and strong even when wet. It's weatherproof, easy to clean, anti-odor and perfect for all conditions.
  • Strong and Soft leash : Experience a leash that's both strong and gentle. With a remarkable 600 lbs pull force resistance, it offers safety and comfort in various weather conditions.
  • Adventure Ready: Designed for active outdoor moments, our dog leash stands up to play, training, and exploration. It's a reliable companion for all your escapades.
  • Multi color and size: We provide different colors to choose from width 3/5 inch with length 5FT /10FT /15FT /30FT/ 50FT. Find the perfect fit for your dog's needs and your preferences.

Product Information

    Brand Name NIMBLE
    Dog Breed Size All
    Unit Count 1 Count
    Item Length 30 feet
    Pet Type Dog
    Manufacturer Nimble
    Number of Items 1
    UPC 884710642978
    Included Components one dog leash
    Item Type Name dog leash
    Model Number dog leash
    Manufacturer Part Number 01
    Target Species Dog
    Warranty Description One month
    Best Sellers Rank
    ASIN B08629589S
    Customer Reviews
    Size 30FT
    Item Dimensions L x W 60"L x 0.4"W
    Material Type Polyvinyl Chloride
    Closure Type Hook and Loop
    Color Orange
    Pattern Dog

You may also like